Bearded Brothers Automation logo

How long does a website redesign take?

By Mick Preston, Bearded Brothers Automation · Published
Agency estimates range widely. Webstacks puts redesigns at 6 weeks to 6 months, Limelight Marketing says about 14 weeks from discovery to launch, and Clear Digital says 3 to 6 months from planning to launch. Your timeline depends on site size, how fast your content is ready, and how quickly you make decisions.
Bakery owner and web designer pinning page sketches to a corkboard while planning a redesign

Everyone wants a number. It depends, and a big piece of “it depends” is in your hands.

That is not a dig. Building pages is the part a designer controls. Gathering your photos, deciding what the site should say and signing off on each step is the part you control. That second part is also the one you can speed up.

Below is what agencies quote, what happens in each stage, and what you can do to keep your project moving.

How long does a website redesign take?

Agencies give a wide range of estimates, and they are worth reading as estimates, not promises. One agency says website redesign timelines vary from 6 weeks to 6 months. Another says a good quality non-e-commerce website will take around 14 weeks from the discovery stage to launch. A third says a redesign typically takes 3 to 6 months from planning to launch.

Those numbers overlap, but they are not the same, because every project is different. A small site with a handful of pages and ready content moves faster than a larger site with many pages, a store, or a lot of old content that needs sorting. Treat the range as a rough frame, then ask any designer you talk to for a schedule built around your site.

Paper wireframe sketches and sticky notes laid out like a website redesign timeline
A redesign moves through clear stages, and laying them out on a wall makes the timeline easy to see.

What happens in each stage?

Different shops name the stages differently, but the work falls into the same order.

Plan and audit. Someone looks at your current site, your goals and your customers. You decide what the site must do, which pages stay, which go, and what you want people to do when they arrive. This is also when you collect your analytics and take a list of the pages that already bring in calls. If you want a head start, read what to do before redesigning your website.

Content. This is the words, photos and details that go on each page. You may write them, your designer may write them with your input, or you may split the job. Real photos of your work and your team usually beat stock images.

Design. The designer shows you how the pages will look, usually starting with the home page. You give feedback, they adjust, and you agree on a look before anything gets built.

Build. The approved design becomes a working site. Pages, forms, phone layouts and contact options all get built and filled with your content.

Test. Everything gets checked on phones, tablets and computers. Forms get tested, links get clicked, and speed gets measured. This is where small mistakes get caught while they are cheap to fix.

Launch. The new site replaces the old one. If your web addresses change, the old ones need to point to the right new pages. Our post on whether a redesign will hurt your SEO covers how to protect what you have.

Watch. After launch, you keep an eye on things. You check that pages show up, forms reach you, calls come in and nothing is broken. Plan to fix a few small things in the first weeks.

What slows a redesign down?

The two things you control most are content and decisions, so that is where to look first.

Content slows things down when the words and photos are not ready. A designer can build a beautiful page, but it cannot go live with a blank space where your services should be. Start gathering photos and writing down your services now, before the project begins.

Decisions slow things down when feedback comes back late, or when several people each want a different change. Pick one person who has the final say. Give feedback in one batch instead of in pieces, and answer questions fast.

Other things can add time too. Changing the plan halfway through, adding pages late, and fixing a messy old site all stretch the schedule. A site with many old pages, or a store with a lot of products, simply has more to move and more to check.

How long until Google catches up?

Launch day is not the finish line. After you launch, Google needs time to find the new pages and sort out what changed. Google’s own guidance says small to medium sites can take a few weeks for most pages to move, and that you should expect some temporary ups and downs in ranking during a move.

That is normal. It does not mean the redesign failed. What helps is a clear map of old web addresses to new ones, plus a sitemap so Google can find the new pages. Check your results over the following weeks before you decide anything is wrong.

How can you speed it up?

You cannot rush good work, but you can stop slowing it down. A few small habits help a lot.

Get your content ready early. Write down your services, gather your best photos and collect a few customer reviews you are allowed to use. Decide who signs off on each step. Keep the scope steady once the design is approved, and save new ideas for after launch. If the site is large, ask whether you can launch the most important pages first and add the rest later.

Take a few minutes tonight to write a plain list of the pages you want and the photos you already have. That list shortens the planning stage more than almost anything else, and it shows you quickly what is still missing. If it helps, our guide on how often a small business should redesign its website can help you decide if now is the right time.

If you want help sizing up your own project, book a free website review with us and we will give you a realistic plan.

Frequently asked questions

Can you launch a redesign in phases?

Yes. Some owners launch the pages that matter most first, such as the home page, services and contact page, then add the rest later. It gets the new site live sooner, but you need a clear plan so old and new pages do not clash.

How long does a small website redesign take?

A small site usually sits toward the short end of what agencies quote. Even so, the time depends less on page count than on how soon you can supply text, photos and decisions. Ask your designer for a schedule that shows what they need from you and when.

More booked appointments. More revenue.

We build the automation that gently turns your website visitors and leads into booked appointments. No chasing, no hard sell. You just show up to more jobs.

Get My Free Booking Plan →

Keep reading

Got a question? Ask Beardy 👋

Beardy

Automated assistant

Powered by Bearded Brothers Automation